Just checked the ULM website and it looks like the building construction is moving forward with the outside painted, doors/windows installed and equipment (today) preparing the front parking lot for asphalt. I know the contractor probably lost at least a week due to the recent flooding (no telling how all of the sub contractors fared) but does anyone have an update occupancy date? Also if anyone is in the area a few pictures would be appreciated.
http://www.ulmwarhawks.com/mediaPortal/player.dbml?&id=&catid=0&KEY=&DB_OEM_ID=1
http://www.ulmwarhawks.com/mediaPortal/player.dbml?&id=&catid=0&KEY=&DB_OEM_ID=1